REPLACEMENT FLOORING AT TUNNELL ELEMENTARY SCHOOL MULTIPURPOSE ROOM AND KITCHEN (5267)
Replace District-Provided Flooring in the Multipurpose room and awarded contractor to provide, and install Epoxy flooring in the Kitchen. The anticipated start date is June 19, 2023.
Bid Documents
(click to expand/collapse)

Name | Size | |||
5267 Bid Documents | 1.4 MB | |||
Install Instructions Gule Down LVT | 547.2 KB | |||
Mohawk Lineate | 501.8 KB | |||
Mohawk Warranty | 699.6 KB | |||
Revised_Tunnell Site Maps 2970_001 | 248.9 KB | |||
Statement of Work Tunnell MU and Kichen Flooring | 95.6 KB | |||
Tunnell ES Asbestos Work Plan-final | 511.0 KB |