Public Jobs

Bids due in 3 days
5/10/21 2:00 pm
Colonia Gym Roof Replacement, PW 20-56
City of Oxnard
170 N. Marqiuta St, Oxnard
Project includes furnishing all necessary labor, materials, equipment and other incidental and appurtenant Work to re-roof approximately 11,300 square feet of the Colonia Gymnasium roof and three lower roofs over the office and storage areas using a fully-adhered, thermoplastic polyolefin (TPO) roof membrane system.
Bids due in 6 days
5/13/21 3:00 pm
OVSD Sewer Lateral Connection Insert, Proj No. 2021-04
Ojai Valley Sanitary District
Various locations in Ojai
Install approximately 160 sewer lateral inserts within the public right of way in Ojai.
Bids due in 11 days
5/18/21 10:00 am
Installation of District-Supplied Flooring at TLES and UPCS, IB-21-04
Pleasant Valley School District
Camarillo, CA
Flooring and cove base demolition and installation at Tierra Linda School and University Preparation Charter School.
Bids due in 11 days
5/18/21 10:00 am
Los Primeros School of Sciences and Arts, Outdoor Learning Center and Fencing, FB-21-05 REBID
Pleasant Valley School District
1555 Kendall Avenue, Camarillo
Removal of chain link fencing, concrete paving, planter boxes, and miscellaneous items to construct an outdoor learning area that includes stamped concrete paving, new fencing and gates, concrete pavers, raised planter, raised garden plots, planting and irrigation, and miscellaneous items.
Bids due in 11 days
5/18/21 1:00 pm
Ventura Harbor Village - New Trash Enclosure
Ventura Harbor (Ventura Port District)
1575 Spinnaker, Ventura
Construction of a new trash enclosure at building 1575, and the demolition of the existing trash enclosure at 1575. Modification of the approach to the trash enclosure from the sidewalk, to enhance the handicap accessibility.
Bids due in 13 days
5/20/21 3:00 pm
Upper Courtyard Boys’ Restroom Improvement; Project No. 21-01
Cold Spring School District
2243 SYCAMORE CANYON RD, Santa Barbara
Project may include repairs to sewer infrastructure located under the slab of the restroom.
Bids due in 17 days
5/24/21 2:00 pm
Electrical Panel Relocation
Montecito Union School District
385 San Ysidro Rd, Santa Barbara
Provide infrastructure for So Cal Edison service upgrade. Provide new main service and concrete pad. Coordinate installation with PV project equipment. Decomission old main service and pad. Provide electrical connection to south property.
Bids due in 19 days
5/26/21 10:00 am
ADA Access Improvements for Le Petit Cafe
Ventura Harbor (Ventura Port District)
Ventura Harbor Village, 1591 Spinnaker Drive #112, Ventura
Removal and replacement of concrete ADA access ramp to provide handicap accessibility consistent with the current Building Code. Install handrail on all sides of the ADA ramp and new stairway.
Bids due in 26 days
6/2/21 2:00 pm
ERHS Maintenance & Operations Building, 16-236
Santa Maria Joint Union High School District
Ernest Righetti High School, 941 East Foster Road, Santa Maria, California
Construction of a new Maintenance and Operations metal building. Work to include: New Maintenance Bay space, Break Room, 2 Offices, Key Room, Work Room, Laundry, and Restroom. New work will also include metal stud walls, HVAC, plumbing, electrical and fire alarm work. Exterior grading is to occur, and utilities are to be provided to the site. Exterior flatwork is Concrete.
Bids due in 27 days
6/3/21 2:00 pm
ERHS Phase 2 Modernization, 18-280
Santa Maria Joint Union High School District
Ernest Righetti High School, 941 East Foster Road, Santa Maria, California
Modernization of 6 existing classroom buildings. The classroom buildings include 11 science laboratories, 1 home economics classroom, 1 library, 1 music classroom, 1 band classroom, 34 general classrooms, as well as minor ADA upgrades to several restrooms. New building electrical and mechanical systems are provided including the replacement of the existing fire alarm system. New architectural finishes are provided including flooring, carpeting, ceilings, wall coverings, and paint. Portions of demising walls are removed and replaced. Contractor will be responsible for hazardous materials abatement necessitated by the project work. In an effort to minimize disruptions and impacts to the school schedule, the classroom modernization shall occur over 5 separate phases for a total project duration of 21 months.