REPLACEMENT FLOORING AT TUNNELL ELEMENTARY SCHOOL MULTIPURPOSE ROOM AND KITCHEN (5267)
Replace District-Provided Flooring in the Multipurpose room and awarded contractor to provide, and install Epoxy flooring in the Kitchen. The anticipated start date is June 19, 2023.
Addenda
(click to expand/collapse)

Name | Size | |||
20230213162347898 ADDENDUM NO 1 | 153.1 KB | |||
20230214171923028 ADDENDUM NO. 2 | 41.1 KB | |||
20230227163119243 ADDENDUM NO. 3 | 39.8 KB |