24-485 Summer Flooring
The District intends to have a licensed flooring contractor remove existing floor covering, perform minor floor preparation, and install owner-supplied floor covering (type dependent on location). Owner furnished – Contractor Installed products include: carpet, walk off carpet, LVT, HVT, sheet vinyl, floor feather finish and adhesives, 4” rubber wall base. Contractor will need to provide transition strips, trim finishes (e.g., stair nosings, treads, risers, visual safety strips, etc.) trim finish adhesives for all work areas, and any other items necessary to complete the job. Carpet will be direct-glued. No grinding or leveling appears to be necessary at this time. Furniture will be moved by the District.
Status
Bidding Closed
Prebid Date4/17/24 2:30pm
Bid Date4/26/24 2:00pm
Location
Pioneer Valley High School, 675 Panther Drive, Santa Maria, CA; Santa Maria High School, 901 S. Broadway, Santa Maria, CA; Support Services Center, 2560 Skyway Drive, Santa Maria, CA