Goleta Sanitary District: Biosolids and Energy Phase 1 Project
The work shall be as follows:  Construction and equipping of a new 500,000 gallon 50-ft diameter prestressed concrete digester; Furnishing and installing a 160-kW cogeneration system with integrated digester gas cleaning system; Improvement to the existing digester heating system; Yard piping associated with the above work; Electrical and Instrumentation and Control Work associated with the above work; Demolition work associated with the above work.
    
    
    
    
    
    
    
            
                                                Plans
                 (click to expand/collapse)
 (click to expand/collapse)
            
             (click to expand/collapse)
 (click to expand/collapse)
            | Name | Size | ||
| Biosolids and Energy Phase 1 Volume 4 | 11.2 MB | 