CVWD South Coast Conduit Carpinteria Reach Lateral Isolation Valve Replacement (LIVR)

The work consists of removal of existing piping, valves, and vaults and the construction of new burial isolation valves on 31 South Coast Conduit Laterals in the Carpinteria area for the Carpinteria Valley Water District
CVWD SC Conduit LIVR (click to expand/collapse)
Order this section, price will be calculated by SQFT
This is available for download & digital takeoff to registered users Log in now
Order files below, price will be calculated by SQFT
Name Date Size
01 G-1_CVWD SC Conduit - LIVR 10/6/2021 593.4 KB
02 G-2_CVWD SC Conduit - LIVR 10/6/2021 335.9 KB
03 C-1_CVWD SC Conduit - LIVR 10/6/2021 1.0 MB
04 C-2_CVWD SC Conduit - LIVR 10/6/2021 1.1 MB
05 C-3_CVWD SC Conduit - LIVR 10/6/2021 1.2 MB
06 C-4_CVWD SC Conduit - LIVR 10/6/2021 1.8 MB
07 C-5_CVWD SC Conduit - LIVR 10/6/2021 1.4 MB
08 CD-1_CVWD SC Conduit - LIVR 10/6/2021 736.1 KB
09 CD-2_CVWD SC Conduit - LIVR 10/6/2021 1.5 MB
10 CD-3_CVWD SC Conduit - LIVR 10/6/2021 895.3 KB
11 CD-4_CVWD SC Conduit - LIVR 10/6/2021 1.3 MB
12 CD-5_CVWD SC Conduit - LIVR 10/6/2021 1.5 MB
13 P-1_CVWD SC Conduit - LIVR 10/6/2021 1.3 MB
14 P-2_CVWD SC Conduit - LIVR 10/6/2021 1.1 MB